Eight Steps To Building a Risk Informed Integrated Master Schedule


0. Assemble a credible Work Breakdown Structure. Along with that a credible WBS Dictionary

1. Assess the aleatory risks in the WBS and the IMS. Determine what the variances will be for the work efforts of the activities.

2. Adjust the activity durations and sequence to create th needed schedule (and cost) margin to handle the aleatory risk

3. Assign the schedule and cost margins to protect the end item deliverables

4. Identify the Event Based (Epistemic) risk from the WBS Dictionary 

5. Assign these risk to the Risk Register 

6. Develop risk handling plans for each of these risks. 

7. Determine the cost and schedule impacts for each of these Epistemic risk. Create management Reserve for the risk that have not mitigation strategies. Assign work for mitigating the risks in the IMS, budget that work, and measure the performance of the work in reducing the risk as planned

8. Assemble the aleatory and epistemic uncertainties, the cost of mitigation for the epistemic risks, and the Management Reserve, cost and schedule margin, along with all the planned work, to see if it all fits within the Total Allocated Budget (TAB)

I found this useful list here

Advertisements

One thought on “Eight Steps To Building a Risk Informed Integrated Master Schedule

  1. Pingback: The Best of March 2013 | Nelson Biagio Jr

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s